Pre-Development Checklist

There are many steps to take and issues to consider before you complete the project you have in mind. Use this checklist to record items you have completed. Ask how Stanker & Galetto can provide expert help to take the frustration out of the permit process and ultimately save you valuable time and money.

SITE REQUIREMENTS
__ Location (Land)
__ Outbound Survey
__ Soil Borings
__ Zoning
__ Setback Lines
__ Utility Easements
UTILITY REQUIREMENTS
__ Electric Power
__ Natural Gas
__ City Water
__ Public Sanitary Sewers
__ Treatment Works Approval
__ Well Drilling Permits / Water Treatment
PUBLIC POLICY COMPLIANCE
__ Zoning Variances
__ Local Site Plan Approval
__ County Site Plan Approval
__ Storm Water Permit
__ Soil Erosion Permit
__ DOT Approval
__ Environmental Audit
__ Traffic Study
CONSTRUCTION APPROVALS
__ Building Permit
__ Inspections
__ Utility Connections
__ Street Opening Permits
__ A.D.A. Compliance
__ Certificate of Occupancy

*This is only a partial list. Specific analysis of each site will eliminate and/or uncover other approvals as required.

Download & Print

Download a PDF version of our Pre-Development Checklist to print and fill out for your project.